• GZ Yuexiang Engineering Machinery Co., Ltd.
    krystal burgess
    AS ALWAYS, FAST AND FRIENDLY SERVICE.
  • GZ Yuexiang Engineering Machinery Co., Ltd.
    James McBride
    Transaction went smoothly, Seller was very helpful. Product arrived as promised, Very happy and will do business with them in future.
  • GZ Yuexiang Engineering Machinery Co., Ltd.
    Dallas Skinner
    very happy with all aspects of order. Communication was great from ordering to delivery
  • GZ Yuexiang Engineering Machinery Co., Ltd.
    claudio vera garcia
    the product of very good quality. arrived in perfect condition and at the agreed time.
  • GZ Yuexiang Engineering Machinery Co., Ltd.
    Daniela Czapska
    I'm very satisfied! Transaction at the highest level. Item very well packed. Recommended the Seller
Contact Person : Dongdong Yao
Phone Number : +8613247509480
WhatsApp : +8618928965241

Excavator DX225 Replacement For Centaflex Coupling Assy K1013825

Place of Origin China
Brand Name Belparts
Model Number DX225
Minimum Order Quantity 1PCS
Price Negotiated price
Packaging Details Wooden
Delivery Time 2-3 days
Payment Terms Paypal,T/T and trade assurance
Supply Ability 500 pieces per month

Contact me for free samples and coupons.

WhatsApp:0086 18588475571

Wechat: 0086 18588475571

skype: sales10@aixton.com

If you have any concern, we provide 24-hour online help.

x
Product Details
Condition New Warranty 1 YEAR, 6 Months
Appliion Excavator Engine Drive Coupling Available In Stock
Quality Control Strict 100% Test Clasiffiion Hydraulic Pump Coupling
Highlight

DX225 Centaflex Coupling Assy

,

K1013825 Centaflex Coupling Assy

Leave a Message
Product Description

EXCAVATOR DX225 replacement for Centaflex coupling Ass'y K1013825

 

Product Description

 

DX225 Coupling Assy
Product Description:DX225 Coupling Assy
Model NO.: DX225
Appliion: Excavator Machine
Factory Price:Wholesale
Condition: Original new
Quality Warranty:1 year
Delivery: Within 3 days
Packing: Wooden
Payment Terms: L/C,T/T,MoneyGram
MOQ: 1 PC
Guarantee: We will check the goods and send detail pictures to buyer to confirm before shipping.

 

K1013825 COUPLING Doosan parts COUPLING

 

Excavator DX225 Replacement For Centaflex Coupling Assy K1013825 0

 

Doosan machinery list:

Doosan parts alog

DX210 / DX225LCB

  • PUMP MOUNTING » COUPLING K1013825

DX220A / DX225LCA

  • PUMP MOUNTING » COUPLING K1013825

DX220AF

  • PUMP MOUNTING » COUPLING K1013825

DX225LC

  • PUMP MOUNTING » COUPLING K1013825

DX225LC

  • PUMP MOUNTING » COUPLING K1013825

DX225LC (S/N 5433~)

  • PUMP MOUNTING » COUPLING K1013825

DX225LCA

  • PUMP MOUNTING » COUPLING K1013825

DX230LC

  • PUMP MOUNTING » COUPLING K1013825

TXC225LC-2

  • PUMP MOUNTING » COUPLING K1013825

Parts on group DX210 / DX225LCB:

Pos. Part No Qty Parts name Comments
-. 400911-00038 [-]    
1. 400914-00153B [1]    
1. 400914-00153A [1]   400914-00153B
1. 400914-00153 [1]   400914-00153A
2. 110508-18473 [1]    
2. 229-00025C [1] COVER;PUMP  
3. K1013825 [1] COUPLING  
3A. *NA00546 [1] HUB  
3B. 2474-7009 [1] ELEMENT  
3C. *NA00559 [4] . INSERT  
3D. *NA00561 [4] . INSERT  
3E. K9000422 [1] SOCKET BOLT SET(8EA)  
3F. *NA00136 [2]    
3G. *NA00779 [12] BALL  
3H. 2474-7009K [1] ELEMENT KIT  
4. S0558266 [9] BOLT  
4. S0512266 [9] BOLT  
5. S0558366 [3] BOLT M10X1.5X40  
5. S0512366 [3] BOLT  
6. 120804-00070 [12] WASHER  
6. S5102603 [12] . WASHER  
7. S2227866 [4] BOLT  
8. K1012105 [4]    
8. S5111103 [4] WASHER;SPRING  

 

Our Service 

 

1.We provide the product 6 months guarantee from the ship date.


2. We have advanced techno ledge and 100% testing before delivery.


3. Quick delivery and competitive price.


4. The larger quantity you order, the better price and faster delivery we can supply


5. We have a professional team to offer professional service for you.

 

 

FAQ

Q1:How long is the warranted time?
For natural broken, 3 months. Guarantee genuine parts.

 

Q2: What's payment you can accept?
T/T, CHINESE BANK.

Q3: What's package? Can you give me the package according my requirement?
Yes, Original packing or Neutral packing with wooden box or carton.

 

Q4: How about the lead time?
1) In stock: 1-3days.Always in 24 hours.
2) Out of stock: It's according to your quantity, and we have cooperated with factory.
We will let you know when we quote.