Send Message
GZ Yuexiang Engineering Machinery Co., Ltd. 86- 020-89853372 sales@belparts-china.com
SH200 HD250  Hydraulic Pilot Valve / Pilot Relief Valve For Construction Machinery Excavator

SH200 HD250 Hydraulic Pilot Valve / Pilot Relief Valve For Construction Machinery Excavator

  • High Light

    main control valve

    ,

    main relief valve

  • Condition
    New
  • Size
    OEM Size
  • Warranty
    3 Months
  • Appliion
    Construction Machinery
  • After Warranty Service
    Online Support, Spare Parts
  • OEM NO.
    Available
  • Place of Origin
    China
  • Brand Name
    Belparts
  • Model Number
    SH200 HD250
  • Minimum Order Quantity
    Negotiable
  • Price
    Negotiated price
  • Packaging Details
    Wooden case
  • Delivery Time
    2-5days
  • Payment Terms
    T/T, Western Union,Paypal
  • Supply Ability
    500 pieces per month

SH200 HD250 Hydraulic Pilot Valve / Pilot Relief Valve For Construction Machinery Excavator

Hydraulic Pilot Valve SH200 HD250 Pilot Relief Valve for Construction Machinery Excavator

 

Products Description

 

Parts Name
Hydraulic Pilot Valve
OEM NO.
Available
Model
SH200 HD250
MOQ
1 PCS
Payment
T/T, Westernuion, Paypal, HSBC
Lead Time
Within 72 Hours

 

SH200 HD250 Pilot Relief Valve Pictures show :

SH200 HD250  Hydraulic Pilot Valve / Pilot Relief Valve For Construction Machinery Excavator 0

SH200 HD250  Hydraulic Pilot Valve / Pilot Relief Valve For Construction Machinery Excavator 1

 

The working principle of Relief Valve:

 

Otherwise the pressure may increase and lead to process failure, instrument or equipment failure or fire.To relieve pressure by allowing pressurized fluid to flow out of the system through an auxiliary channel.

 

The relief valve is designed or set to open at predetermined set pressures to protect pressure vessels and other equipment from pressures exceeding their design limits.

 

 

Supply Ability:

 

Supply Ability: 500 Piece/Pieces per Week

 

Packaging & Delivery

 

Packaging Details: First layer is packed in plastic and the second in wooden cases

 

Port: HuangPu

 

Delivery time :Within 24 hours

 

Advantage:


1.Prompt delivery


2.Sincere service


3.Reasonable price&High quality


4:We also have stock in these parts

 

FAQ:
 

Q:May I have a trail order?

A: Of course! Trail order is necessary for new customers. MOQ is small.

 

Q:What's the time of delivery?
A: Basic item we can send 3-7 days since we have stock. Some small order we will send 10-20 days accordingly. Bulk orders we will deliver 20-40 days accordingly.

 

Q:Can we believe in you and your parts?

A:

1: Productive capacity

We own our seal factory. That means we can meet your quality well at a competitive price accordingly.

 

2. Product promise

1) Our delivery time will be just 10-15 working days

 

2) After-sales Service : Ensure to solve your problem and achieve better

 

3. Experience

Our company is a professional manufacture in the excavator seals and seal kit in china and has a good reputation all over the world.

 

Q: Quality of the products have a guarantee?

A: Please be assured, all products we sell would go through strict testing at the factory prior.

 

Q: Where is your stores loed? How can I visit there?

A: Loed in Guangzhou city, Guangdong Province, China. Near Huangpu Guangzhou Port.

Welcome to visit us! We accept customized according to your sample, welcome to your order.

 

Tips:Hitachi Excavator Parts 4372038 Main Control Valve EX200-5 DH300-7 Main Valve