Send Message
GZ Yuexiang Engineering Machinery Co., Ltd. 86- 020-89853372 sales@belparts-china.com
PC120-6  PC200-5 Excavator Diesel Engine Spare Parts 4D95 Alternator 600-821-6130

PC120-6 PC200-5 Excavator Diesel Engine Spare Parts 4D95 Alternator 600-821-6130

  • High Light

    excavator hydraulic parts

    ,

    excavator replacement parts

  • Warranty
    6 Months, 6 Months
  • Type
    Alternator Assembly
  • Product Name
    Alternator
  • Appliion
    Engine Parts
  • Size
    OEM Standard Size
  • Voltage
    28V 35A
  • Place of Origin
    China
  • Brand Name
    Belparts
  • Model Number
    PC120-6 PC200-5
  • Minimum Order Quantity
    Negotiable
  • Price
    Negotiated price
  • Packaging Details
    Wooden case
  • Delivery Time
    2-5days
  • Payment Terms
    T/T, Western Union,Paypal
  • Supply Ability
    500 pieces per month

PC120-6 PC200-5 Excavator Diesel Engine Spare Parts 4D95 Alternator 600-821-6130

PC120-6 PC200-5 Excavator diesel engine spare parts 4D95 alternator 600-821-6130

 

Product description

 

 

Working life

10,000 Hours

part no

600-821-6130

Material

Aluminum

Appliion

Diesel PC200-1 6D105 S4D105 Engine

Power

28V 35A

Warranty

6 mouths

Item Name

Alternator

car make

Excavator construction machinery

Model Number

PC200-1 6D105 S4D105

1Price

1 PCS USD 80

MQQ

1 Piece

Port

Huangpu

 

Spare part (600-821-6130) ALTERNATOR A. (25A),(SEE FIG.A6010-B0L3) (Komatsu)

Part No

(600-821-6130)

Part Name

ALTERNATOR A. (25A),(SEE FIG.A6010-B0L3)

Weight

7.160 kg

How to buy?

If you want best price click Price request It's free!

 

Schemes of the spare part (600-821-6130) ALTERNATOR A. (25A),(SEE FIG.A6010-B0L3)

Number 1 on the scheme, Qty 1

PC120-6  PC200-5 Excavator Diesel Engine Spare Parts 4D95 Alternator 600-821-6130 0

Show more schemes: 9

Models comprising the spare part (600-821-6130) ALTERNATOR A. (25A),(SEE FIG.A6010-B0L3)

Hydraulic Excavator

6D105-1F; 6D105-1U; S4D105-5B; S6D105-1G;

Engine

6D105-1L; 6D105-1M-A; 6D105-1M-AM; 6D105-1M-F; 6D105-1M-P; 6D105-1M-PF; 6D105-1N; 6D95L-1A; 6D95L-1AF-12; 6D95L-1B; 6D95L-1C; 6D95L-1HH; S4D105-5E; S4D95L-1J; S4D95L-1K-C; S4D95L-1K; S4D95L-1L; S6D105-1F; S6D105-1F; S6D105-1NN; S6D105-1PP; S6D105-1PP; S6D105-1QQ; S6D105-1QQ; S6D95L-1B; S6D95L-1C; S6D95L-1D; S6D95L-1GG; S6D95L-1GG; S6D95L-1KK-1; S6D95L-1L; S6D95L-1NN-18; S6D95L-1NN-18; S6D95L-1Q; S6D95L-1W;

Aggregates comprising the spare part (600-821-6130) ALTERNATOR A. (25A),(SEE FIG.A6010-B0L3)

Model Section node
6D105-1U COOLING AND ELECTRICAL SYSTEMS / ALTERNATOR AND MOUNTING (25A)(#66010-)
6D105-1F COOLING AND ELECTRICAL SYSTEMS / ALTERNATOR AND MOUNTING (25A)(#63408-)
6D105-1M-AM ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)
6D105-1M-F ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)
6D105-1M-P ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)
6D105-1M-PF ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)
6D105-1L ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)
6D105-1M-A ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)
6D105-1N ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)
6D95L-1C ELECTRICAL SYSTEM / ALTERNATOR AND MOUNTING (25A)(#19677-)

Our Services:

 

1. OEM Manufacturing welcome: Product, Package...
2. Sample order
3. We will reply you for your inquiry in 24 hours.
4. after sending, we will track the products for you once every two days, until you get the products. When you got the
goods, test them, and give me a feedback.If you have any questions about the problem, contact with us, we will offer
the solve way for you.

 

FAQ

 

Q1. What is your terms of payment?
A: 1)As for sample order T/T or western union 100% before delivery!
2)As the bulk order T/T 30% as deposit, and 70% before delivery. We'll show you the photos of the products and packages before you pay the balance.

 

Q2. What are the international express delivery and logistics we cooperate with?
A: Global DHL, TNT, UPS, SF, FedEx, Guangzhou, Shanghai, Qingdao, Shenzhen, various port freight forwarding companies.We ship air shipping, sea shipping and truck shipping in some countries.

 

Q3. How about your delivery time?
A: Generally, it will take 3-5 days after receiving your advance payment. The specific delivery time depends on the items and the quantity of your order.

 

Q4: How do we make the payment?
A5: We accept L/C, T/T, Paypal, West Union, Alibaba Trade Assurance payment