logo
player background
live avator

5s
Total
0
Today
0
Total
0
Today
0
  • What would you like to know?
    Company Advantages Sample Service Certificates Logistics Service
Online Chat WhatsApp Inquiry
Auto
resolution switching...
Submission successful!
products
PRODUCTS DETAILS
Home > Products >
Mini Size Hitachi Replacement Parts ZX330 Swing Main Relief Valve Top Grade

Mini Size Hitachi Replacement Parts ZX330 Swing Main Relief Valve Top Grade

MOQ: 1PCS
Price: Negotiated price
Standard Packaging: Standard Packing
Delivery Period: 2-5days
Payment Method: T/T, Western Union,Paypal
Supply Capacity: 1000 pieces per month
Detail Information
Place of Origin
China
Brand Name
Belparts
Model Number
ZX330
Material:
Steel
Delivery Time:
Within 24h-48h
MOQ:
1 PC
Model:
ZX330
Appliion:
Excavator
Shipment:
Sea.Air.Express
Product Name:
Pressure Reducing Valve
Packing:
Standard Packing
Brand:
Belparts
Highlight:

main relief valve

,

main control valve

Product Description

Hitachi Replacement Parts Valve ZX330 Swing Main Relief Valve

 

Hitachi Replacement Parts Valve ZX330 Swing Main Relief Valve description:

 

Part name: Pressure Reducing Valve
Applied excavator: PZX330
MOQ:1 PC
Place of origin : China 
Payment term :T/T , Western Union ,Paypal, trade assurance
Packing : As request or standard packing
Delivery time : Based on order
Brand:Belparts
Color:Grey
Means of transport :By sea/air, DHL,Fedex

 

ZX330 Swing Main Relief Valve Pictures Show :

 

Mini Size Hitachi Replacement Parts ZX330 Swing Main Relief Valve Top Grade 0

 

Feedback:

 

Since your feedback is very important to our business`s development, we sincerely invite you to leave positive feedback for us if you are satisfied with our product and service. It`ll just take you 1 minute. Thank you!

 

Shipping:

 

1. Packaging & Delivery
Packaging Details
Intercooler radiator water tank
1. Foam cotton packing inning
2. Standard Size Wooden Box external.
Port
Guzangzhou huangpu port
Lead Time :
Aluminum radiator :2~7working after payment

 

 

Payment&Packing& Shipping:

 

A). TT transfer, Western Union, Paypal,
B). Light goods inner box is neutral white with an strong outer box.Heavy goods wooden with standard packing.If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
C). Delivery time: depends on items you buy, most electric parts can shiped within 1-3 working days.
D). DHL /Fedex /UPS /TNT/ARMEX/SF Express ,etc. normal express shipping way for small cargo.
Russia,Kazakhstan, Ukraine Russia Special Line,Bangladesh,Myanmar,Vietnam ect, competitive shipping way no need you do customs clearance.Door to Door.

 

 

Guarantee:

 

1. Guarantee:3 months after selled.

2. During guarantee,the items share free repairs or replacement.

3. Customer is responsible for the freight come-and-go,and the custom tax.

4. You may consider to send the defective item with a economical way,and we send back the repaired items with your new order together.

5. To save the cost,pls send the item back without packing.

6. Pls provide the defective appearance and related invoice number.

7. We do not repair or replace item with an expired warranty.

8. All emails will be answered within 1 business day. If you do not receive our reply, please kindly re-sent your email or give us a call any time.

 

 

FAQ:

 

Q: When will ship my order?
A:Once we get confirmation of payment, we will try our best to ship order within 24 hours.


Q: Which shipping term you can supply?
A:By sea, air or by express ( DHL, Fedex, TNT, UPS, EMS)


Q: How long does it take to my address?
A:The Normal delivery time is 2-7 days, depending on which country you are in.


Q: How can I trace my order?
A:We will send you the tracking number by email.


Q: If I am not satisfied with the products, can I returns goods?
A:Yes, we offer exchange and repair service under warranty. Please contact us before you.

 

products
PRODUCTS DETAILS
Mini Size Hitachi Replacement Parts ZX330 Swing Main Relief Valve Top Grade
MOQ: 1PCS
Price: Negotiated price
Standard Packaging: Standard Packing
Delivery Period: 2-5days
Payment Method: T/T, Western Union,Paypal
Supply Capacity: 1000 pieces per month
Detail Information
Place of Origin
China
Brand Name
Belparts
Model Number
ZX330
Material:
Steel
Delivery Time:
Within 24h-48h
MOQ:
1 PC
Model:
ZX330
Appliion:
Excavator
Shipment:
Sea.Air.Express
Product Name:
Pressure Reducing Valve
Packing:
Standard Packing
Brand:
Belparts
Minimum Order Quantity:
1PCS
Price:
Negotiated price
Packaging Details:
Standard Packing
Delivery Time:
2-5days
Payment Terms:
T/T, Western Union,Paypal
Supply Ability:
1000 pieces per month
Highlight

main relief valve

,

main control valve

Product Description

Hitachi Replacement Parts Valve ZX330 Swing Main Relief Valve

 

Hitachi Replacement Parts Valve ZX330 Swing Main Relief Valve description:

 

Part name: Pressure Reducing Valve
Applied excavator: PZX330
MOQ:1 PC
Place of origin : China 
Payment term :T/T , Western Union ,Paypal, trade assurance
Packing : As request or standard packing
Delivery time : Based on order
Brand:Belparts
Color:Grey
Means of transport :By sea/air, DHL,Fedex

 

ZX330 Swing Main Relief Valve Pictures Show :

 

Mini Size Hitachi Replacement Parts ZX330 Swing Main Relief Valve Top Grade 0

 

Feedback:

 

Since your feedback is very important to our business`s development, we sincerely invite you to leave positive feedback for us if you are satisfied with our product and service. It`ll just take you 1 minute. Thank you!

 

Shipping:

 

1. Packaging & Delivery
Packaging Details
Intercooler radiator water tank
1. Foam cotton packing inning
2. Standard Size Wooden Box external.
Port
Guzangzhou huangpu port
Lead Time :
Aluminum radiator :2~7working after payment

 

 

Payment&Packing& Shipping:

 

A). TT transfer, Western Union, Paypal,
B). Light goods inner box is neutral white with an strong outer box.Heavy goods wooden with standard packing.If you have legally registered patent, we can pack the goods in your branded boxes after getting your authorization letters.
C). Delivery time: depends on items you buy, most electric parts can shiped within 1-3 working days.
D). DHL /Fedex /UPS /TNT/ARMEX/SF Express ,etc. normal express shipping way for small cargo.
Russia,Kazakhstan, Ukraine Russia Special Line,Bangladesh,Myanmar,Vietnam ect, competitive shipping way no need you do customs clearance.Door to Door.

 

 

Guarantee:

 

1. Guarantee:3 months after selled.

2. During guarantee,the items share free repairs or replacement.

3. Customer is responsible for the freight come-and-go,and the custom tax.

4. You may consider to send the defective item with a economical way,and we send back the repaired items with your new order together.

5. To save the cost,pls send the item back without packing.

6. Pls provide the defective appearance and related invoice number.

7. We do not repair or replace item with an expired warranty.

8. All emails will be answered within 1 business day. If you do not receive our reply, please kindly re-sent your email or give us a call any time.

 

 

FAQ:

 

Q: When will ship my order?
A:Once we get confirmation of payment, we will try our best to ship order within 24 hours.


Q: Which shipping term you can supply?
A:By sea, air or by express ( DHL, Fedex, TNT, UPS, EMS)


Q: How long does it take to my address?
A:The Normal delivery time is 2-7 days, depending on which country you are in.


Q: How can I trace my order?
A:We will send you the tracking number by email.


Q: If I am not satisfied with the products, can I returns goods?
A:Yes, we offer exchange and repair service under warranty. Please contact us before you.

 

Sitemap |  Privacy Policy | China Good Quality Excavator Hydraulic Pump Supplier. Copyright © 2019-2025 GZ Yuexiang Engineering Machinery Co., Ltd. . All Rights Reserved.