-
Excavator Hydraulic Pump
-
Excavator Hydraulic Pump Parts
-
Travel Motor Assy
-
Excavator Swing Motor
-
Swing Gearbox
-
Excavator Control Valve
-
Travel Gearbox
-
Excavator Final Drive Parts
-
Excavator Center Joint
-
Hydraulic Gear Pump
-
Hydraulic Fan Motor
-
Excavator Spare Parts
-
Excavator Controller
-
Excavator Monitor
-
Excavator Relief Valve
-
Excavator Hydraulic Cylinder
-
Diesel Engine Assembly
-
krystal burgessAS ALWAYS, FAST AND FRIENDLY SERVICE.
-
James McBrideTransaction went smoothly, Seller was very helpful. Product arrived as promised, Very happy and will do business with them in future.
-
Dallas Skinnervery happy with all aspects of order. Communication was great from ordering to delivery
-
claudio vera garciathe product of very good quality. arrived in perfect condition and at the agreed time.
-
Daniela CzapskaI'm very satisfied! Transaction at the highest level. Item very well packed. Recommended the Seller
SH120 SH120A2 Excavator Swing Planetary Gear Parts 2nd Swing Carrier Assy Sun Gear

Contact me for free samples and coupons.
WhatsApp:0086 18588475571
Wechat: 0086 18588475571
skype: sales10@aixton.com
If you have any concern, we provide 24-hour online help.
xMaterial | Alloy Steel | Model Number | SH120 SH120A2 |
---|---|---|---|
Condition | 100% New | Appliion | Crawler Excavator |
Part Name | 2nd Swing Carrier Assy 24T Sun Gear 13T 19T | Color | Gray |
Quality | Made In China | MOQ | 1 Pcs |
Highlight | planetary gear unit,construction equipment parts |
SH120 SH120A2 Excavator Swing Planetary Gear Parts 2nd Swing Carrier Assy Sun Gear
Product Description of SH120 SH120A2 Excavator Swing Planetary Gear Parts 2nd Swing Carrier Assy Sun Gear
Appliion | Excavator |
Part name | SH120 SH120A2 Excavator Swing Planetary Gear Parts 2nd Swing Carrier Assy Sun Gear |
Material | Steel |
Model | SH120 SH120A2 |
MOQ | 1PC |
Warranty | 6 months |
Payment term | T/T, Western union, paypal, trade assurance or as required |
Delivery | 2 days after the payment received |
Shipment | by sea, by air, by express or as required |
Detailed picture of SH120 SH120A2 Excavator Swing gear parts 2nd Swing carrier assy Sun Gear
Parts we also can supply:
About the gear parts we can supply travel gearbox and swing gearbox parts, such as the 1st sun gear, 2nd sungear, 3rd sun gear, 1st carrier (spider) ass'y, 2nd carrier (spider) ass'y, 3rnd carrier (spider) ass'y, gear ring, spindle, hub, cover, planetary gear, pin of planetary, thrust, bearing, etc. These parts are made in China with very competitive price but the quality is very steady. Can be used for 2-3 years.
In addition, we also have travel and swing gearbox (reduction) ass'y for , , hyundai, komatsu, hitachi, kobelco, JCB, doosan, etc.
Supply Ability
Supply Ability: 1 Piece/Pieces per Month
Packaging & Delivery
Packaging Details: Standard shipping package
Port: Huangpu port
Lead Time
Quantity(Pieces) | 1 - 1 | >1 |
Est. Time(days) | 2 | To be negotiated |
Our advantage
1. Usually, the goods will be dispatched within 3 days after receipt of payment.
2. Upon receipt of payment, IN-STOCK items will ship on or before the next business day.
3. We can ship by sea, by air (door to airport), by express (door to door, DHL, TNT, UPS, FEDEX, EMS, etc)
FAQ
Q1:Could you custom products?
We can manufacture it according to your drawings or samples.
Q2: I want to buy your products, how can I pay?
A :You can pay via T/T , WEST UNION or other payment terms we reach agreement.
Q3: How can you guarantee the quality?
A: One year's warranty against B/L date.
If You meet with quality problem, we promise to responsible for it.
Q4: If we don’t find what we want on your website, what should we do?
A: You can email us the descriptions and pictures of the products you need, We will check whether we can make it.
Q5: Can we buy 1 pc of each item for quality testing?
A: Yes, we understand quality test is important and we are glad to send 1pc for quality testing.
Q6: What is the lead time?
A: For this product, normally 3 days,3 days and lead time is calculated from the day we receive your deposit.
Exact time is determined by factory schedule.